Filter Reports for Individual Media Filters
On this page:
- Submit a Filter Profile Report (FPR)
- Submit a Filter Assessment Report (FAR)
- Submit a Comprehensive Performance Evaluation (CPE)
If an individual media filter produces water with elevated turbidity that suggests declining performance, inadequate filtration; or, if the performance cannot be determined, additional investigative steps must be taken by the public water system. These requirements do not apply to water treatment plants with an active Corrective Action Plan issued by the TCEQ. Once data is entered into the Surface Water Monthly Operating Report (SWMOR) spreadsheet, it will automatically determine if a Filter Profile Report, Filter Assessment Report, or Comprehensive Performance Evaluation is needed.
Use the information below to determine the type of investigation report to submit.
Submit a Filter Profile Report (FPR)
An FPR is required when a single filter produces water with consecutive, 15-minute turbidity readings that are 1.05 nephelometric turbidity unit (NTU) or higher.
Complete an FPR within 7 days of the exceedance:
- Submit the Filter Profile Report Form TCEQ-10276 with your SWMOR. The SWMOR will prompt you to complete a report once data has been entered.
- Instructions to complete the FPR are at SWMOR Guidance Manual (RG-211), Chapter 7.
Example of a completed FPR
Submit a Filter Assessment Report (FAR)
A FAR is required when a single filter produces water with consecutive, 15-minute turbidity readings that are 1.05 NTU or higher, three or more times during a consecutive three-month period.
Complete a FAR within 14 days of the third exceedance:
- Submit a Filter Assessment Report Form TCEQ-10277 with your SWMOR. The SWMOR will prompt you to complete this report once data has been entered.
- Instructions to complete the FAR are at SWMOR Guidance Manual (RG-211), Chapter 8.
Example of a completed FAR
Submit a Comprehensive Performance Evaluation (CPE)
A CPE is required when a single filter, or combination of filters, produces water with consecutive, 15-minute turbidity readings that are 2.05 NTU or higher, on two separate occasions during two consecutive months.
Complete and submit a CPE form immediately:
- Submit a Comprehensive Performance Evaluation Form TCEQ-10278. The SWMOR will prompt you to complete this report once data has been entered, but do not wait until the end of the month to submit this request form.
- Instructions to complete the CPE are at SWMOR Guidance Manual (RG-211), Chapter 9.